Sewage Parameters 6 Part 2: Total Nitrogen

Welcome back,

Today we are going to discuss how to actually denitrify (the conversion of NO3 to Nitrogen (N) and Oxygen (O2) gas which is given off in the atmosphere) which is the second step in the process to lower Total Nitrogen in treated sewage effluent and is termed Denitrification.

The total Nitrogen reduction process has been explored in depth in some previous articles;

1. Sewage Parameters 6 Part 1: Total Nitrogen

2. Sewage Parameters 5 Parts 1 & 2: Ammonia (NH4)

As regards package sewage treatment, denitrification is a much more tricky process than nitrification as it only takes place in the presence of specific conditions:

Firstly, effluent needs to be rich in nitrates (NO3) after being nitrified from ammonia (NH4)

Secondly, a carbon source is required for bacteria to respire (utilising a carbon source to produce energy)

Thirdly, an anoxic environment needs to be present.  This is distinct from an anaerobic environment in that some oxygen may be present but no active aeration of the nitrate rich effluent can take place.If all three are achieved certain species of bacteria can respire using Nitrogen instead of oxygen, which ultimately leads to conversion of nitrates to nitrogen (N2) and oxygen (O2) gas, which is given off in the atmosphere, thus lowering total nitrogen levels.  Respiration using nitrogen is not as energy efficient as with oxygen, so if oxygen levels rise enough, nitrification will be inhibited.  It therefore is a process with many variables which need to be controlled to achieve denitrification.

Normal practice to achieve denitrification involves placing an anoxic tank, which was sized to take 8 hours of the average flow into plant at the inlet of the sewage treatment plant thus providing a carbon source in the form of incoming sewage.  Nitrified effluent from the outlet of the sewage treatment plant then needs to be recirculated to the inlet of the anoxic tank.  A 50:50 mixture of sewage and nitrified effluent is normally contained in the anoxic tank, where if anoxic conditions are in place, denitrification should take place. The process creates both oxygen and nitrogen gas, which needs to be removed to maintain anoxic conditions and to lower the total nitrogen level.  This is normally achieved by a submerged mixing pump.  The process often requires adjustment and is also temperature sensitive.  Many systems will also require pumps to pump the effluent forward to the primary treatment plant and also the nitrified effluent back to the inlet. The BMS Blivet package wastewater treatment plant uniquely generates net hydraulic lift from inlet to outlet, this means that nitrified effluent can be recirculated under gravity rather than by pumping.  BMS primary settlement area can act as denitrification zone, as it is anoxic zone, so that the whole process (nitrification and denitrification) can be achieved along with BOD and SS reduction in one single, low energy, easy to maintain package sewage treatment plant, without the requirement for expensive extra pumps or separate tankage.  The incoming sewage into the Blivet is the carbon source and the nitrified effluent recirculates under gravity from the outlet of the Blivet where it mixes with the carbon source.  The BMS Denitrifying Blivet can achieve effluent in the region of BOD 10 mg/l SS 10 mg/l Ammonia 5 mg/l Total Nitrogen of 10 mg/l or better if required.

Larger flows generally require a separate denitrification/balance tank, which BMS are also experts in sizing and manufacturing.

A bit about the company:

BMS is a quality manufacturer of package products for wastewater and stormwater treatment. BMS started in 1986 and has exported products to over 50 countries around the world.  It is a third generation family business with huge expertise in wastewater and stormwater.
BMS manufacture a full range of products for surface water and wastewater treatment including our pioneering next generation RBC system the Aerotor, which forms part of our world leading Blivet package sewage treatment plant, a ‘one stop shop’ for all surface water products from design to installation including attenuation, interceptors, holding tanks (incl. chemical resistant), hydrobrakes, rainwater harvesting tanks & vortex silt/oil/debris separators, fully fitted pumping stations, our plug & play vehicle wash water recycling system; the Recyclone and much more.  All BMS products manufactured in our ISO 9001 factory are made using solar energy from our own PV system. 

BMS also can provide a Free Design Service for Sewage Treatment, Pump Stations or Surface Water and a full O&M, Repair, Advice and Testing service for existing installations.  We also can do free CPD Presentations on Sewage Treatment/Surface Water Management at any location. 

We would be delighted to discuss any requirements you might have and we are available to meet you at your convenience.  Please do not hesitate to contact us.